Daily life
TOURS
WORKING ON PHASE 2
IN THE LAB
PHASE 2 INSTALLATION
Site for solar panels to be installed |
Frame installation |
Panels being mounted to frame |
||
Bioroof modules clipped into place |
Spreading seed |
Construction complete |
FIELD TRIP! (NATIVE CHILD AND FAMILY SERVICES OF TORONTO)
FAUNA ON THE ROOF
FIELD TRIP! (CONNON NURSERIES NVK)
WINTERIZING
ECOLOGY STUDIES
3D PRINTING NOZZLES FOR TIPPING BUCKETS
IRROMETER INSTALLATION
IRRIGATION INSTALLATION
WIRING INSTALLATION
SEDUM MAT INSTALLATION